NYC HPD OPEN VIOLATIONS · METRODEEDS.COM · UPDATED DAILY
← NYCHA Watch
Development Profile · NYCHA Watch

HARRISON AVENUE REHAB (GROUP B)

BX🔑 PACT CONVERTED
🔑 PACT CONVERSION

This development was selected for PACT conversion — a public-private partnership typically targeting developments with significant capital needs and deferred maintenance. Conditions may reflect years of deferred repairs prior to conversion.

150 units4 buildings5 stories1.1 acres1 BBLCompleted 1986-12-01
HPD Open Violations
Class C — Immediately Hazardous
2
Heat loss, mold, pests, structural
Class B — Hazardous
0
Plumbing, electrical, vermin
Class A — Non-Hazardous
3
Maintenance, cosmetic
Violations / Unit
0.01
5 total open
Violation Breakdown
Class C
40%2
Class B
0%0
Class A
60%3
311 Housing Complaints
Heat / Hot Water (12 mo)
7
Resident 311 calls
🏛 Housing Court Activity
Tenant Actions (All-Time)
4
Court-ordered repair proceedings
Last 2 Years
1
HP actions filed since 2024
Active Cases
0
Open or pending HP actions
All Case Types
4
Total housing court cases
Recent HP Actions
Case TypeFiledStatusBBL
Tenant ActionApr 2, 2025CLOSED2028680144
Tenant ActionJan 3, 2023CLOSED2028680144
Tenant ActionFeb 7, 2022CLOSED2028680144
Tenant ActionJan 10, 2006CLOSED2028680144
Source: NYC Housing Court (Housing Litigation Division) · dataset r8na-hjbv · Updated regularly
Open HPD Violations (Live)
ClassInspection DateDescriptionStatusBBL
CFeb 3, 2026§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECT…CIV14 MAILED2028680144
CFeb 3, 2026§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOMNOV CERTIFIED ON TIME2028680144
AFeb 3, 2026§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 4L,…CIV14 MAILED2028680144
AFeb 3, 2026§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE ON NORTH WALL IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 1st AP…CIV14 MAILED2028680144
AFeb 3, 2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4…NOV SENT OUT2028680144
Nearby Private Slumlords (within 0.25 mi)
OperatorDistressClass CPortfolioDist.
RODRIGUEZ TEDORA15591 bldg0.23 miProfile →
ORAN MANAGEMENT AND DEVELOPMENT LLC10371 bldg0.15 miProfile →
ARISTA UAC PROPERTIES LP93405 bldgs0.17 miProfile →
ANDREWS PLAZA HOUSING ASSOCIATES9356 bldgs0.15 miProfile →
RAMLAGAN LEILA9341 bldg0.17 miProfile →
Development Details
Program Type
FEDERAL
Construction Type
REHAB
Method
TURNKEY
RAD Transfer Date
Jun 24, 2025
Buildings
4
Stories
5
Acres
1.10
Completion
1986-12-01
Buildings (1 BBLs)
2028680144

Each BBL links to MetroDeeds deed feed for full transaction history.

← All NYCHA DevelopmentsNYC Landlord Ripoff Watch →