This development was selected for PACT conversion — a public-private partnership typically targeting developments with significant capital needs and deferred maintenance. Conditions may reflect years of deferred repairs prior to conversion.
| Case Type | Filed | Status | BBL |
|---|---|---|---|
| Tenant Action | Apr 2, 2025 | CLOSED | 2028680144 |
| Tenant Action | Jan 3, 2023 | CLOSED | 2028680144 |
| Tenant Action | Feb 7, 2022 | CLOSED | 2028680144 |
| Tenant Action | Jan 10, 2006 | CLOSED | 2028680144 |
| Class | Inspection Date | Description | Status | BBL |
|---|---|---|---|---|
| C | Feb 3, 2026 | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECT… | CIV14 MAILED | 2028680144 ↗ |
| C | Feb 3, 2026 | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | NOV CERTIFIED ON TIME | 2028680144 ↗ |
| A | Feb 3, 2026 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 4L,… | CIV14 MAILED | 2028680144 ↗ |
| A | Feb 3, 2026 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE ON NORTH WALL IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 1st AP… | CIV14 MAILED | 2028680144 ↗ |
| A | Feb 3, 2026 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4… | NOV SENT OUT | 2028680144 ↗ |
Each BBL links to MetroDeeds deed feed for full transaction history.