Free account includes 3 full due diligence reports — no credit card requiredSign Up Free →
← Address Lookup
NYC Building Records · BBL 3037800028

456 BLAKE AVENUE

Brooklyn · Block 3780 · Lot 28 · Walk-up apartment (Class C1)

Owner of record

456 BLAKE AVENUE PROJECT LLC
HPD-registered head officer: Moshe Deutsch

HPD registered contacts

People legally accountable to HPD for conditions at this building, in registration-priority order:
  • Head OfficerMoshe Deutsch
  • Corporate Owner456 Blake Ave Project LLC

Most recent deed

Last transferred on Dec 21, 2018 for $430K to 456 Blake Ave Dnib 517 Llc.
Previous owner: Michael Dennis Benjamin, Esq. (as Referee)
Cash sale: no recorded mortgage tied to this transfer.
🔒 See full deed history for this building →

Recent ACRIS documents (last 5)

DateTypeAmountParties
Jun 30, 2025MTGE$750KParties redacted — full names in MetroDeeds Scout+
Jun 30, 2025AGMT$2.5MParties redacted — full names in MetroDeeds Scout+
Nov 21, 2022MTGE$265KParties redacted — full names in MetroDeeds Scout+
Nov 21, 2022MTGE$1.4MParties redacted — full names in MetroDeeds Scout+
Dec 21, 2018DEEDNot disclosedParties redacted — full names in MetroDeeds Scout+
🔒 Unlock party names + multi-decade history →

Building stats

Units
8
Year built
2023
Class
C1
Borough
Brooklyn
Zoning:
R6
Lot size:
3,000 sqft
Building area:
7,372 sqft
Floors:
4
Assessed value:
$425K
Community district:
316
Council district:
42

HPD violations

0 open
Most severe class on record: Class B
No open violations on record. Source: NYC HPD.
🔒 See full violation history →

Recent HPD violation details

Most recent 5 violations issued by NYC HPD at this address:
  • Class AInspected Oct 21, 2025
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE 1st ROOM FROM NORT…
  • Class BInspected Oct 21, 2025
    § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL/BUZZER/INTERCOM SYSTEM FROM BUILDING STREET ENTRANCE TO NORTH1 ROOM L…
  • Class BInspected Oct 21, 2025
    § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT…
  • Class BInspected Oct 21, 2025
    § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE 1st ROOM FROM NORT…
  • Class BInspected Oct 21, 2025
    § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCA…
🔒 See full violation history with closure dates →

Recent ACRIS activity

5 documents in the last 5 years (most recent Jun 30, 2025).

More from MetroDeeds

Go deeper on this building

Open full Landlord Intel for 456 BLAKE AVENUE
Every deed, every violation, court cases, mortgages, and operator portfolio — in one panel.
Get the full deed history for 456 BLAKE AVENUE
3 free reports per month with a MetroDeeds account. No credit card required.
Sign Up Free